MITIGATING RISKS TO ESTABLISH SAFER GROUND
MITIGATING RISKS TO ESTABLISH SAFER GROUND
At RECCE Site Investigation Ltd (RECCE-SI), we support projects across the UK with practical, efficient UXO risk mitigation solutions. From large-scale infrastructure developments to ongoing site investigation works, our approach ensures safety without compromising programme.

Client: Multiple Contractors (Tier 1 Supply Chain)
Location: Cardiff, South Wales
Development: Arena redevelopment and deep foundation works
Intrusive Works: UXO watching briefs (remediation phase), pre-drilling, CPT intrusive surveys, piling, ground investigation
RECCE-SI was engaged across multiple phases of the Cardiff Arena redevelopment, providing UXO risk mitigation support to various contractors operating on the scheme. The site, located within Cardiff’s historic docklands, was subject to significant WWII bombing, with made ground depths of approximately 4m to 9m increasing the potential for deeper bomb penetration. During the remediation phase, RECCE-SI delivered a series of UXO watching briefs to support bulk earthworks and material processing. This was followed by a programme of pre-drilling and CPT intrusive magnetometer surveys to mitigate UXO risk for piling operations, achieving targeted clearance to the required depths in line with CIRIA C681 and Maximum Bomb Penetration Depth (MBPD) principles.
Outcome:

Client: Erith (Principal Contractor)
Location: Surrey Quays Road, London
Development: Post-demolition remediation and groundworks
Intrusive Works: Bulk excavation, remediation, pile removal, pre-drilling, CPT intrusive surveys (crane base clearance)
RECCE-SI provided a UXO watching brief during post-demolition excavation works at a high-risk London site with known WWII bombing history. Support was delivered across multiple phases between 2024 and 2025, with repeated mobilisation as the project progressed. Continuous monitoring ensured safe excavation across multiple structures and work areas.
In addition to the watching brief, RECCE-SI undertook pre-drilling and CPT intrusive magnetometer surveys to facilitate UXO risk mitigation for crane base locations. These works enabled targeted, depth-specific clearance in line with anticipated loading requirements, ensuring safe crane installation within the development footprint.
Outcome:

Client: Site Analytical Services Limited
Location: Conway Street, Hove
Development: Bus depot redevelopment and foundation works
Intrusive Works: Piling, CPT intrusive surveys, pre-drilling, trial pit excavations, window sample boreholes
RECCE-SI undertook an intrusive UXO magnetometer survey to support piling works within an area of potential UXO risk.
In addition to the piling support, a programme of trial pit excavations and window sample boreholes was carried out to characterise ground conditions and inform construction design. These works were integrated with UXO risk mitigation measures to ensure safe intrusive investigation across the site.
Using CPT magnetometer technology supported by pre-drilling, RECCE-SI delivered efficient area-based clearance while facilitating the wider ground investigation scope.
Outcome:

Client: Confidential (Rail Sector Contractor)
Location: London
Development: Rail infrastructure and ground investigation works
Intrusive Works: Borehole drilling, excavation, site investigation
RECCE-SI provides ongoing UXO support for a rail infrastructure project, delivering both watching brief and borehole support services across multiple phases.
Works are carried out within a live rail environment, requiring a flexible and responsive approach to meet programme demands.
Outcome:
We are available to review your project and advise on the most appropriate UXO risk mitigation approach, without obligation.